Comprehensive Technical Documentation for Large-Scale Outdoor Environments.
01 // Project Overview
Outdoor operations face volatile variables. Ambient light pollution from street lamps, humidity affecting lens clarity, and high-velocity wind loads on truss structures are primary risks. Dust management for projector intake is critical.
By utilizing 3 projectors per wall (9 units total), we achieve a high-density 141 Lux average. This configuration allows for either extreme brightness via triple-stacking or ultra-wide seamless blending for complex architectural textures.
02 // System Architecture
With 9 total projectors, Resolume handles a 12-output canvas (9 active, 3 backup/pre-viz). GPU texture sharing remains the bottleneck; we recommend a dual-RTX 4090 setup or a dedicated rack-mounted media server for this scale.
Minimum: Intel Xeon or i9-14900K, 128GB DDR5, Dual NVIDIA RTX 4090 with Quadro Sync II for frame-perfect output synchronization across the 9-projector array.
03 // Power & Infrastructure
The increased load requires two separate 63A 3-Phase feeds or a massive 125A 3-Phase service. A 100kVA silenced generator is required for full system redundancy.
04 // IP Assignment
05 // Calibration
Pixel-perfect convergence of 3 units per surface. Mandatory use of motorized lens shift.
Complex geometric correction in Resolume. Advanced edge blending for 80m width.
Uniformity check across 9 units. Monitoring heat signatures of stacked chassis.
06 // Outdoor Protocol
9 units require specialized stacking enclosures. Thermal management is critical as three Christie 30K units in close proximity generate massive heat (>30,000 BTU/hr per cluster).
With 3 projectors per tower, the weight exceeds 450kg per cluster. Towers must be rated for high wind loads with significant ballast (min 2000kg per tower base).